污污的视频在线观看 I 自拍视频区 I 国产在线一 I 超级碰在线观看 I 农村妇女精品一区二区 I 尤物网在线视频 I 久久精品资源 I 毛片直接看 I 国产3区 I 黄色网炮 I 日本在线视频免费 I 美国特级片 I 亚洲免费综合 I 中文字幕在线观看视频免费 I 国产精品夜夜夜爽阿娇 I 欧美干干干 I 男生插女生下面免费视频 I 又黄又爽一区二区三区 I 污污在线播放 I 国产美女性生活视频 I 久久9966 I 扒开jk护士狂揉免费 I 伊人春色欧美 I 成人v精品蜜桃久久一区 I 日韩电影免 I 欧洲精品码一区二区三区 I 九色亚洲 I 外国性调教视频 I 91精品国产综合久久小美女 I 久久久99精品成人片中文字幕 I 国产精品毛片更新无码 I 一区二区亚洲欧美在线 I 婷婷五点开心六点丁 I 国产毛片a高清日本在线 I 国精产品一线二线三线av I 亚洲美女一级 I 国产成一区二区 I 一级成人网 I 午夜精品久久久久久久99水蜜桃

Wuxi Gotele Metal Products Co., Ltd : CN EN
首頁 >>新聞動態 >>工程項目新聞

Golden Gate Bridge: an Exceptional piece of Steel Engineering



San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

首頁電話產品導航
CN EN